The repeated failures of a single seal with an unreliable Plan 32 were causing a heavy-duty high head slurry pump at a South Wales steelworks to break down on average every three weeks.
Metal and Glass-Working Case Studies
Warman conversion the answer for Spanish company
A seal conversion kit for the Warman® AH Range of Ultra Heavy Duty Slurry Pumps helped to solve a variety of problems being experienced by a Spanish aluminium producer.
LabTecta the remedy for lip seal failures
The lip seals in use at a north of England glass manufacturer were wearing out after just a few weeks, resulting in a complete loss of oil in the gearbox and causing the gears to seize up.
Reliability upgrade improves reliability 700%
A major steel producer in South Africa were experiencing unacceptable leakage and reliability with one of their lime slurry pumps.
Seal upgrade improves reliability and simplifies maintenance
A major integrated zinc / lead smelter company in Canada was unhappy with the performance of the existing mechanical seal.
Improved Safety and Reliability
A major manufacturer in the UK were having reliability issues with the seal on a critical Labour chemical pump used to pump caustic solution.
Zinc Smelting Plant Saves Thousands
Experiencing repeat leakage of a highly abrasive zinc oxide and sulphuric acid solution
AESSEAL upgrade solution leads to an 8 year failure free period
Upgrading from gland packing to a dual seal and system helps eliminate seal failure due to inconsistent water supply.