Metal and Glass-Working Case Studies

CAPI™ dual seal ends slurry pump failures

CAPI dual seal ends slurry pump failures

GB Flag

The repeated failures of a single seal with an unreliable Plan 32 were causing a heavy-duty high head slurry pump at a South Wales steelworks to break down on average every three weeks.

Warman® conversion the answer for Spanish company

Warman conversion the answer for Spanish company

ES Flag

A seal conversion kit for the Warman® AH Range of Ultra Heavy Duty Slurry Pumps helped to solve a variety of problems being experienced by a Spanish aluminium producer.

LabTecta the remedy for lip seal failures

LabTecta the remedy for lip seal failures

GB Flag

The lip seals in use at a north of England glass manufacturer were wearing out after just a few weeks, resulting in a complete loss of oil in the gearbox and causing the gears to seize up.

Reliability upgrade improves reliability 700%

ZA Flag
A major steel producer in South Africa were experiencing unacceptable leakage and reliability with one of their lime slurry pumps.

Seal upgrade improves reliability and simplifies maintenance

CA Flag
A major integrated zinc / lead smelter company in Canada was unhappy with the performance of the existing mechanical seal.

Improved Safety and Reliability

GB Flag
A major manufacturer in the UK were having reliability issues with the seal on a critical Labour chemical pump used to pump caustic solution.

Zinc Smelting Plant Saves Thousands

PL Flag
Experiencing repeat leakage of a highly abrasive zinc oxide and sulphuric acid solution

AESSEAL upgrade solution leads to an 8 year failure free period

IT Flag
Upgrading from gland packing to a dual seal and system helps eliminate seal failure due to inconsistent water supply.